30/1/17. Staff have been hard at it today . |
30/1/17. Two dumpers going , this keeps the digger busy. |
30/1/17. Staff all wrapped up . Temperatures were at -7oc in the morning. |
30/1/17. Laterals with (100mm piping) will be attached to the main drain from the fairway. |
30/1/17. The drains on the fairway will remove the surface water that has been an issue on this hole. |
30/1/17. Drainage coil piping all positioned ready to be installed. |
30/1/17. Callum from PTM PLANT HIRE doing a fantastic job . |
30/1/17. As you can see its a long main drain (240m long) . |